Set on the edge of the Pacific Ocean, this beautiful coastal plant is designed for 0.8 MGD, featuring a two-train, two-stage aeration activated sludge system.
CONTRACTORWahlund Construction, IncENGINEERHDR Engineering, Inc.REPRESENTATIVEMISCO WaterShare