Skip to content Skip to footer

A 0.6 MGD plant and a rehabilitated 0.6 MGD plant, both featuring Aeromod’s standard two-stage, two-train design with Bio-P removal. An expansion as a Phase 3 project was designed in 2023 and soon will be completed.  

CONTRACTORTalcon Group, LLCENGINEERBaskerville-Donovan, IncREPRESENTATIVEPump & Process EquipmentShare